Handrail Replacement

 

 


11/30/2010 Project Update:

     Handrail installation on the rear side balconies completed.

     Units 1804 & 1812

20101129bluff55bld8pic016.jpg

       Rear side elevation view of Building 8 with new handrails;

20101129bluff55bld8pic017.jpg

     Units 1808 & 1816;

20101129bluff55bld8pic018.jpg

     As per Regime 55 request, damaged soffit over rear side of unit 1817 was repaired using new composite materials "Hardisoffit" and "XO PVC" wood grain trim, as a sample for the future repair/replacement work (as shown in the picture below);

20101129bluff55bld8pic019.jpg

     Damaged soffit vent replaced over unit 1810;

20101129bluff55bld8pic020.jpg

 


11/18/2010 Project Update:

     New handrails installed at units # 1804 & 1812;

20101112bluff55bld8pic007.jpg 

 

     Spalled concrete slab discovered at the balcony of Unit 1805; Contractor, Community manager and Engineer have met on-site to determine proper course of action, to correct the issue.;

20101119bluff55bld8pic008.jpg 

      New handrails installed at Units 1813 & 1805. Handrail at Unit 1805 installed temporarilly, for safety. Shall be removed and re installed after concrete slab repairs.

20101119bluff55bld8pic011.jpg

     New Handrails installed at Units 1811 and 1803;

20101119bluff55bld8pic012.jpg 

     New handrails installed at unit 1810 & 1802; Fascia installation will be complete on November 19.

20101119bluff55bld8pic013.jpg 

     New Handrails installed on Unit 1814 & 1806;

20101119bluff55bld8pic014.jpg

 

 


11/15/2010 Project Update:

     Handrail replacement project started on 11/15/2010 at Units 1812 & 1804;

20101112bluff55bld8pic006.jpg

 


     New, aluminum powder coated handrails fabricated and delivered on project site by Shaw MFG on November 15 at 9:00AM. Handrails inspected by Charlie Walczak at 10:00AM.


           PICTURES OF EXISTING HANDRAILS ON BUILDING 8:

 

     Units # 1808 & 1816

20101112bluff55bld8pic001.jpg

 

      Units 1809, 1817, 1807 & 1815

20101112bluff55bld8pic002.jpg

 

      Units 1802, 1810, 1803, 1811, 1805 & 1813

20101112bluff55bld8pic004.jpg

     

      Units: 1806 & 1814

20101112bluff55bld8pic005.jpg


 

11/12/2010 Building Permit issued by Town Of Hilton Head Island. 

11/09/2010 Building permit issued by Sea Pines ARB.

11/03/2010 Fabrication of new handrails started at Shaw Manufacturing.

11/01/2010 Work agreement signed between EURO Construction, Inc. and Bluff Villas, Regime 55 for rear side balconies handrail replacement on building 8.