Unit 1-A Restoration
Flood damage restoration at
Unit 1-A, Beachwood Place
-
08/10/2009 Project Complete:
Living Room
Kitchen
Guest Bedroom
Guest Bathroom
Guest Bathroom
Master Bedroom
Master Bedroom
Master Bathroom
Master Bathroom
Hall between Bedrooms
Guest Bathroom
-
06/15/2009 Progress update:
Sheetrock hanged in guest bedroom. Joints muded and sanded, prepared for paint application.
Guest bedroom window view. A/C handler adopter box and handler installed.
View to the hall. Sheetrock prepared for paint. Crown molding installation complete. Door casing installation in progress.
Master Bedroom. A/C hanler installed. wall under handler prepainted.
Master Bathroom. Sheetrock prepared for paint. Crown molding installed.
Master Bedroom. Vie to the hall and closet.
- 05/21/2009 Before restoration Begins:
View from the guest bedroom to the bathroom
Guest bathroom floor after removal of old bath tub.