Building 8
Regime 55
Handrail replacement project on the rear side of Building 8 was finished on Monday, November 29, 2010. For more information and pictures, please use link "Handrail Replacement" on the right side menu.
Handrail replacement project on the rear side of building 8, started on November 15-th at Unit 1812. For more information please use link "Handrail Replacement" on the right side menu.
For the membrane roofs inspection results, please use the link "Flat Roof Inspection" on the right side menu.