Previous Projects

     
     
  • Tanglewood Villas - Complete Exterior Renovation on 60 Villas.
    • Complete exterior renovation, including full windows and exterior doors replacement, New wall insulation, sheathing, siding and trim. New soffit panels and fascia trim. Demolition and rebuilt of all balconies. New handrails. New carpet in exterior walkways. Complete exterior paint work. Interior sheetrock repairs and minor paint work.

Before 

 

tgl600rear.jpg
 
   
  • 2007 Stoney Creek, Unit#270- Sea Pines Plantation
    • Complete interior renovation and kitchen remodeling. Changed kitchen floor plan in order to add kitchen island with eat-in bar. New kitchen cabinets and appliances. New bathroom fixtures in all three bathrooms. New wall/floor and ceiling tile in all three bathrooms. New stairs with handrails. Replaced all interior doors with hardware and interior trim. Replaced all interior light fixtures, new electrical meter with emergency disconnect, new A/C ductwork and attic insulation. New hardwood and carpet floors. Interior paint.
128037_0.jpg  
  • 2007 A Place At The Beach  - South Forest Beach (24 Units)
    • Complete exterior/interior renovation. Moisture damage and wood rot repairs. Exterior siding and trim replacement, New "WeatherShield" impact glass window and sliding patio door installation for all 24 units. New entry doors with luvered storm door. All rear balconies and front side walkways rebuilt using new pressure treated lumber. New aluminum handrails on balconies and walkways. New handicapped access platform and three stop commercial elevator installed. Complete replacement of old in-wall air conditioning units with new "Fujitsu" minisplit a/c systems. New, standing seam metal roof with gutters and downspouts installation. Complete electrical, cable TV and phone service replacement. Partial-to-full interior renovation in most units. New bathroom fixtures, kitchen appliances, new hardwood, tile and carpet flooring. Interior/exterior paint.
128037_0.jpg  
  • 2007 Stoney Creek - Sea Pines Plantation (62 Units)
    • Complete exterior trim replacement, Moisture damage and wood rot repair. Complete wood decks replacement. Stucco siding repair. New property/villa number signs. Complete asphalt shingle roof replacement. Entry and service door replacement on selected units. Exterior paint. 
128037_0.jpg  
  • 2005-2006 Plantation Club XX - Sea Pines Plantation (12 Units)
    • Complete exterior siding and trim replacement. Moisture damage and wood rot repair. Completely rebuilt service yard fences. New Pella windows and sliding patio doors installed in most units. Complete rear balcony and concrete patio replacement. 
128037_0.jpg  
  • 2005 Tanger Outlets - Bluffton
    • Partial exterior siding and trim replacement on selected factory stores. Moisture damage and wood rot repair. 
  • 2005 Carolina Place - Sea Pines Plantation (30 Units)
    • Exterior siding and trim partial replacement. Moisture damage and wood rot repair. Partial and full deck replacement at selected units. Partial roof shingles replacement. Stucco siding repairs. Partial windows and sliding patio doors replacement. Entry doors replacement in selected units. Wood structure repairs in crawl space. Exterior paint. 
Before
After
  • 2004 Mariners Point - Hilton Head Plantation (72 Units)
    • Wood rot repairs on enclosed porches.
  • 2004 Lawton Villas - Sea Pines Plantation (35 Units).
    • Exterior siding and trim partial replacement, moisture damage repairs, partial windows and sliding patio doors replacement ("POZZI" products used). Wood rot repairs in service yards.
 
  • 2003-2005 Shipmaster Villas - Shipyard Plantation (86 Units).
    • Complete exterior siding and trim replacement on 19 buildings. Complete balcony and handrail replacement using new, pressure treated wood materials, front yard fence replacement with new design and using pressure treated wood and composite siding. Moisture damage and wood rot repairs. Selected window and sliding patio door replacement. Selected front entry and service door replacement. Exterior paint.
     Before
      After

  • 2001-2003 Forest Gardens - Cordillo Pkwy. (104 Units)
    • Complete exterior siding and trim replacement, wood rot repairs. Complete balcony/deck replacement, all windows and sliding patio doors replacement, front entry door replacement, moisture damage and wood rot repairs, complete roof shingles replacement. Moisture damage and sagging floors repair. Exterior paint.
Before
After
  • 2003 Harbor Master Villas - Shipyard Plantation (63 Units)
    • Exterior siding and trim repair, service yard and property fence replacement, exterior window shutters installation, exterior paint.

 

 harbmaster.jpg  
  •  2002-2003 Briarwood Villas - Sea Pines Plantation (45 Units)
    • Complete exterior siding and trim replacement, Service yard fence and gates replacement, window and exterior door replacement, Exisiting Carolina room remodeling, existing screen porch conversion to Carolina room. Complete exterior re-paint.

 

 

 briarwood.jpg  
  • 2002 Mariners Point - Hilton Head Plantation (72 Units)
    • Complete exterior siding and trim replacement. Windows replacement, moisture damage and  wood rot repair.
   
  • 1999-2000 Sail Master Villas - Shipyard Plantation (51 Units)
    • Partial exterior siding replacement (mostly side walls). Moisture damages and wood rot repairs. Front yard fence partial replacement.
 sailmaster.jpg