270 Stoney Creek

August 27, 2007 Construction Updates:

  • Magazine table installed
  • Kitchen appliances installed
  • Tile between cabinets installed
  • Carpet in first floor guest room, second floor guest room and master bedroom installed
  • New faucets, toilets, sinks installed in bathrooms

P1010319.jpg

P1010320.jpg

P1010321.jpg

P1010323.jpg

P1010324.jpg

P1010325.jpg

P1010327.jpg

P1010328.jpg

P1010329.jpg 

Wood floor matching with wood samples 

 P1012800.jpg

P1012796.JPG

 

 

August 08, 2007 Construction update

  • Cabinetry countertops installed
  • Crown molding for kitchen cabinetry installed
  • Hardwood floor installed
  • All ceiling lightening installed
  • Fans in living room and master bedroom installed
  • Air conditioning working and control panels installed
  • Ventilation hole grids installed
  • Stairs to second floor installed
  • Railing for stairs installed
  • Magazine table installation in progress
  • Master bathroom and second floor guest bathroom tile installation finished
  • Smoke detectors installed
  • All painting work finished

P1010250.jpg

P1010251.jpg

P1010252.jpg

P1010253.jpg

P1010255.jpg

P1010256.jpg

P1010257.jpg

P1010264.jpg

P1010266.jpg

July 19, 2007 Construction update

  • All walls and ceiling painted
  • Kitchen cabinetry installed
  • All power outlets and switches installed
  • First floor guest bathroom and master bathroom tiles installation finished
  • Second floor guest bathroom tile installation in progress
  • All door adjustment in progress
  • New ac ventilation pipes installed
  • Electrical boxes for lights installed
  • New panels installed in service room
  • New plumbing pipes installed

P1010192.jpg

P1010195.jpg

P1010196.jpg

P1010198.jpg

P1010199.jpg

P1010201.jpg

P1010203.jpg

P1010205.jpg

P1010208.jpg

P1010211.jpg

June 22, 2007 Construction update

  • Interior door installed
  • Door triming finished
  • Wall preparation for painting in progress
  • Kitchen bar framing built
  • Crown molding installation will be finished tomorow
  • Windows installed 3" deeper

P1010137.jpg

P1010138.jpg

P1010139.jpg

P1010140.jpg

P1010141.jpg

P1010142.jpg

P1010145.jpg

P1010146.jpg

P1010147.jpg

P1010149.jpg

P1010151.jpg

May 25, 2007 Construction update

  • Interior door installation has started

May 10, 2007 Construction update

  • Sheetrock installation finished at almost all rooms

p1010029.jpg

p1010031.jpg

p1010033.jpg

p1010035.jpg

 

April 26, 2007 Construction update

  • Interior door ordered and delivery planed for 3rd of May
  • Stairs to second floor framin finished
  • Sheetrock installation work starts tomorow

February 16, 2007 Construction update

 

  • Prepared tranch for plumbing lines replacement in kitchen
  • Prepared opening in floor for beam support footing
  • Prepared tranch for plumbing lines replacement in downstairs bathroom
  • Framed new closet in downstairs bedroom
  • Framing finished for owner's closet upstairs to allow for packet door

 

Renowation work has been resumed on Tuesday February 13th after asbestos abatement. Building permit was issued February 2, 2007.

Below are some progress pictures.

 