Stoney Creek 267 Kitchen and Bathroom renovation

   

January 16, 2009

     Interior renovation work finished. Final Inspection conducted on January 16/2009. General clean

 

     Kitchen:

dsc_0488.jpg      

           

 dsc_0489.jpg

 

Living Room, Stairwell:

dsc_0490.jpg 

dsc_0491.jpg 

dsc_0492.jpg 

dsc_0494.jpg

dsc_0495.jpg 

 dsc_0496.jpg

 Guest Bedroom & Bathroom:

dsc_0497.jpg

dsc_0498.jpg 

 dsc_0499.jpg

 Master Bedroom and Bathroom:

dsc_0500.jpg

     New, frameless glass door in master shower.

dsc_0501.jpg 

      New vent-heat-light unit in both bathrooms. New A/C registerdsc_0502.jpg

      Insulated clear glass installed in master bedroom-living room window.dsc_0503.jpg

 

 January 8, 2009

            Master Bedroom:

Install Clear Insulated Glass panel in the master bedroom wall opening. Trim-out and paint wood trim around new window.

20090106_wnd2.jpg

20090106_wnd.jpg

            Kitchen:

20090106_kchn.jpg

            Master Bathroom:

20090106_mst.jpg

            Guest Batthroom:

20090106_gst.jpg

            December 30, 2008

            Kitchen:

Furnish and install corian countertops on the new cabinets in kitchen with seamless double sink (white). Counter top color - Maui "B". Edge treatment - eased edge.

20081230_kchn.jpg

20081230_kitchen.jpg

20081230_kichen.jpg

            Master Bathroom:

Furnish and install corian vanity top with seamless oval sink (white). Counter top color - Maui "B". Edge treatment - eased edge.

20081230_master.jpg

            Guest Bathroom:

Furnish and install corian vanity top with seamless oval sink (white). Counter top color - Maui "B". Edge treatment - eased edge.

20081230_guest.jpg

            December 15, 2008

             Kitchen:

Install new "Canterbury Maple" base and cathedral wall cabinets, supplied by Lowe's. Place back all existing and new appliances (to be connected by electrician and plumber).

20081216_kitchen.jpg

20081216_kitch.jpg

20081215_kitchen.jpg

            Master Bathroom:

Install new, Devon white Thermo Foil Square 13W vanity cabinet supplied by Lowe's. Install new cabinet hardware.

20081215_master.jpg

            Guest Bathroom:

Install new, Devon white Thermo Foil Square 13W vanity cabinet supplied by Lowe's. Install new cabinet hardware.

20081215_guest.jpg

           December 10, 2008

           Guest Bathroom:

Install new 12x12 Loft-Beige porcelain tile on shower wall. Install 4x12 Toscana Bone border tile on shower walls @ 3/4 wall height.  Install marble threshold in the doorway. Apply tile grout and two applications of grout sealer on all new tiled surfaces.

20081210_guest.jpg

           December 01, 2008

           Master Bathroom:

Install new 12x12 Loft-Beige porcelain tile on bathroom floor and shower wall. Install 4x12 Noce-Listello border tile on shower walls @ 3/4 wall height. Install 2x2x12 Chiaro-Tumbled marble tile on shower floor, Install edge bulnose, and marble threshold in the doorway. Apply tile grout and two applications of grout sealer on all new tiled surfaces.
20081201_maser_b.jpg

           November 24, 2008

           Guest Bathroom:

Install new 12x12 Loft-Beige porcelain tile on bathroom floor:

20081124_guest_bathroom.jpg

           Master Bathroom:

Install new 12x12 Loft-Beige porcelain tile on bathroom floor:

20081124_master_bathroom.jpg

20081124_master.jpg

           Kitchen:

Install new 16"x16" Rialto-White porcelain tile on prepared kitchen floor surface (Strait pattern). Apply tile grout and two grout sealer applications.

20081124_kich.jpg

20081124_kichen.jpg

           November 19, 2008

           Guest Bathroom:

Sand ant paint guest bathroom walls:

20081120_guest.jpg

           November 18, 2008

           Kitchen:

Cover wall with wallpaper:

20081120_kchn1.jpg

20081120_kcn.jpg

           November 14, 2008

           Kitchen:

Sand and primed kitchen walls:

20081118.jpg

20081118_kich.1.jpg

           November 11, 2008

Master  & guest bathrooms:

     Installed new waterproof sheetrock on walls and ceiling. New housings for can lighths. Installed wiring for mirror defogger. 

20081117master.jpg

 

 20081117_master_bathroom.jpg      Installed hardboard on shower walls with joint sealant. Shower controls, drain and spray line ready for plumbing inspection.20081117_guest_bathroom.jpg

 

 

20081117_guest.jpg

           November 6, 2008

           Master Bathroom:

 Build additional framing on exterior wall to allow for new plumbing and shower niche. Build 3" doorway curb. Install hardboard on the bathroom and shower floors and shower walls. Waterproof shower walls, install floor membrane.

20081110_master__bathroom.jpg

           November 4, 2008

 Install new bath in guest bathroom

20081110_guest_bathroom.jpg

           November 3, 2008

           Master Bathroom Floor Replacement:

 Replace rot plywood in the master bathroom.

20081103_master_bathroom.jpg

           Guest Bathroom Floor Replacement:

Replace rot plywood in the guest bathroom.

20081103_guest_bathroom.jpg

           October 30, 2008

           Demolition in Guest bathroom:

 Remove and dispose of existing tub door, vanity mirror, paper holder and towel bar. Remove and dispose of wall tile and drywall sheathing above existing tub.
Remove and dispose of existing tub, toilet,  vanity top, sink and cabinet. Remove and dispose of existing floor covering.

20081027gstbdr2.jpg

20081027gstbdr1.jpg

            October 29, 2008

            Demolition in Master bathroom:

Remove and dispose of existing tub door, vanity mirror, paper holder and towel bar. Remove and dispose of wall tile and drywall sheathing above the existing tub.
Remove and dispose of existing tub, toilet,  vanity top, sink and cabinet. Remove and dispose of existing floor covering.

20081027_mstbed.jpg

20081027_mstbed1.jpg

           October 28, 2008

           Demolition:

 Remove and dispose of existing countertops. Remove and dispose of existing base and wall cabinets, baseboards. Remove and dispose of existing vinyl flooring in the kitchen, clean-out floor surface from adhesive.

20081027_ktchn1.jpg

20081027_ktchn.jpg 

           October 27, 2008

 Preparation Work:

Cover furniture in Master and guest bedrooms.

20081027_covergst_bdrm.jpg 

20081027_cover1.jpg

20081027_cover2.jpg

Move and cover living room furniture. Make space in living room for temporary appliance placement. Cover carpet.

20081027_lvngr1.jpg

20081027_lvngr.jpg