Stoney Creek 267 Kitchen and Bathroom renovation
January 16, 2009
Interior renovation work finished. Final Inspection conducted on January 16/2009. General clean
Kitchen:
Living Room, Stairwell:
Guest Bedroom & Bathroom:
Master Bedroom and Bathroom:
New, frameless glass door in master shower.
New vent-heat-light unit in both bathrooms. New A/C register
Insulated clear glass installed in master bedroom-living room window.
January 8, 2009
Master Bedroom:
Install Clear Insulated Glass panel in the master bedroom wall opening. Trim-out and paint wood trim around new window.
Kitchen:
Master Bathroom:
Guest Batthroom:
December 30, 2008
Kitchen:
Furnish and install corian countertops on the new cabinets in kitchen with seamless double sink (white). Counter top color - Maui "B". Edge treatment - eased edge.
Master Bathroom:
Furnish and install corian vanity top with seamless oval sink (white). Counter top color - Maui "B". Edge treatment - eased edge.
Guest Bathroom:
Furnish and install corian vanity top with seamless oval sink (white). Counter top color - Maui "B". Edge treatment - eased edge.
December 15, 2008
Kitchen:
Install new "Canterbury Maple" base and cathedral wall cabinets, supplied by Lowe's. Place back all existing and new appliances (to be connected by electrician and plumber).
Master Bathroom:
Install new, Devon white Thermo Foil Square 13W vanity cabinet supplied by Lowe's. Install new cabinet hardware.
Guest Bathroom:
Install new, Devon white Thermo Foil Square 13W vanity cabinet supplied by Lowe's. Install new cabinet hardware.
December 10, 2008
Guest Bathroom:
Install new 12x12 Loft-Beige porcelain tile on shower wall. Install 4x12 Toscana Bone border tile on shower walls @ 3/4 wall height. Install marble threshold in the doorway. Apply tile grout and two applications of grout sealer on all new tiled surfaces.
December 01, 2008
Master Bathroom:
Install new 12x12 Loft-Beige porcelain tile on bathroom floor and shower wall. Install 4x12 Noce-Listello border tile on shower walls @ 3/4 wall height. Install 2x2x12 Chiaro-Tumbled marble tile on shower floor, Install edge bulnose, and marble threshold in the doorway. Apply tile grout and two applications of grout sealer on all new tiled surfaces.
November 24, 2008
Guest Bathroom:
Install new 12x12 Loft-Beige porcelain tile on bathroom floor:
Master Bathroom:
Install new 12x12 Loft-Beige porcelain tile on bathroom floor:
Kitchen:
Install new 16"x16" Rialto-White porcelain tile on prepared kitchen floor surface (Strait pattern). Apply tile grout and two grout sealer applications.
November 19, 2008
Guest Bathroom:
Sand ant paint guest bathroom walls:
November 18, 2008
Kitchen:
Cover wall with wallpaper:
November 14, 2008
Kitchen:
Sand and primed kitchen walls:
November 11, 2008
Master & guest bathrooms:
Installed new waterproof sheetrock on walls and ceiling. New housings for can lighths. Installed wiring for mirror defogger.
Installed hardboard on shower walls with joint sealant. Shower controls, drain and spray line ready for plumbing inspection.
November 6, 2008
Master Bathroom:
Build additional framing on exterior wall to allow for new plumbing and shower niche. Build 3" doorway curb. Install hardboard on the bathroom and shower floors and shower walls. Waterproof shower walls, install floor membrane.
November 4, 2008
Install new bath in guest bathroom
November 3, 2008
Master Bathroom Floor Replacement:
Replace rot plywood in the master bathroom.
Guest Bathroom Floor Replacement:
Replace rot plywood in the guest bathroom.
October 30, 2008
Demolition in Guest bathroom:
Remove and dispose of existing tub door, vanity mirror, paper holder and towel bar. Remove and dispose of wall tile and drywall sheathing above existing tub.
Remove and dispose of existing tub, toilet, vanity top, sink and cabinet. Remove and dispose of existing floor covering.
October 29, 2008
Demolition in Master bathroom:
Remove and dispose of existing tub door, vanity mirror, paper holder and towel bar. Remove and dispose of wall tile and drywall sheathing above the existing tub.
Remove and dispose of existing tub, toilet, vanity top, sink and cabinet. Remove and dispose of existing floor covering.
October 28, 2008
Demolition:
Remove and dispose of existing countertops. Remove and dispose of existing base and wall cabinets, baseboards. Remove and dispose of existing vinyl flooring in the kitchen, clean-out floor surface from adhesive.
October 27, 2008
Preparation Work:
Cover furniture in Master and guest bedrooms.
Move and cover living room furniture. Make space in living room for temporary appliance placement. Cover carpet.