Plantation Club Regime 21 (unit 452)

 Exterior Remodeling - Rear Side dsc_0001.jpg

New, enlarged balcony and screened-in porch addition,

Sliding Patio Doors And All Window Replacement 

For Mr. And Mrs. Rogers

 

 


 

08/09/2010 Final Update:

     All repair work for Villa # 452 is finished. Removable window panels installed on the interior side of the screen porch.

20100809plcl452pic030.jpg

 

20100809plcl452pic029.jpg 

 

07/09/2010 Construction Update:

     Screen porch addition and balcony remodeling for unit 452 finished. Commercial raingutters, downspouts and gutter helmets ordered and should be installed shortly. Congradulations Mr. & Mrs. Rogers! Please enjoy!

20100709plcl452pic027.jpg 

      Existing patio in front of living room doow expanded to the corner of the new screen porch.

20100709plcl452pic028.jpg

 

06/15/2010 Construction Update:

     New, wood grain Hardipanels applied on screen porch ceiling and painted. Fiberglass screen installation in progress. Tile installation on porch floor in progress.

20100610plc452pic026.jpg 

 

     New, enlarged balcony floor finished with porcelain 12x12 tile. New pressure treated handrails built and painted.

20100610plc452pic025.jpg 

 

06/10/2010 Construction Update: 

 

     Emergency egress window installed in the front side bedroom upstairs (End wall):

20100610plc452pic024.jpg

 

     Two new windows installed in the front wall of upstairs bedroom:

20100610plc452pic023.jpg

    

     New double panel window installed at the bathroom upstairs (front side) 2x2 privacy rail re installed:

20100610plc452pic022.jpg

 

     New sliding patio door installed for the bedroom upstairs by the balcony:

20100610plc452pic021.jpg

 

     New, three panel window installed at upstairs bedroom:

20100610plc452pic019.jpg

 

     New sliding patio door installed at living room:

20100610plc452pic018.jpg 

 

     New balcony floor waterproofed and prepared for floor tile installation;

20100610plc452pic017.jpg 

     Porch floor being prepared for new floor tile installation; 

20100610plc452pic016.jpg

 

     New, Andersen sliding patio door installed at dining room;

20100610plc452pic015.jpg 

 

 

06/02/2010 Construction Update:

     New balcony & screen porch framing complete with TRT plywood subfloor. Trim board installation in progress.

20100604plc452pic013.jpg 

      New balcony framing in progress.

20100604plc452pic012.jpg

      Begining to frame balcony structure.

 20100604plc452pic011.jpg

 Wood rot repair under second floor sliding door complete. Ready to start balcony framing.

20100604plc452pic010.jpg 

 New, pressure treted wood framing between first and second floor sliding doors.

20100604plc452pic009.jpg 

 Wood rot replacement in progress between first and second floor sliding doors. 

20100604plc452pic008.jpg

      Termite damage to the right side sliding door framing at the living room.

20100602plc452pic006.JPG 

 

 05/21/2010 Construction Update:

     Removed second floor balcony structure. Wood rot repair in progress between first and second floor sliding doors.

20100521plc452pic004.jpg

     Wood rot in second floor framing structure caused by ipropert flashing between balcony framing and wall structure.

20100521plc452pic005.jpg

 


 

05/20/2010 Construction Update:

     Front side bedroom and bathroom windows replaced with new impact glass products by Andersen Windows.

20100521plc452pic002.jpg

     Front side bedroom window in the end wall replaced with new, impact glass double window by Andersen. This window meets Egress requirements.

20100521plc452pic001.jpg

     Rear side bedroom window replaced with new, impact resistant glass window by Andersen.

20100521plc452pic003.jpg 


 

05/17/2010 Window replacement project started. 

05/13/2010 Andersen windows delivered to EURO Warehouse. 

04/02/2010 Placed order for new Andersen 400 Series sliding doors and five windows upstairs.


04/01/2010 Villa # 452 existing elevations:

 

Front side

dsc_0001.jpg

 

End Wall

dsc_0006.jpg

 

Rear Side

 

dsc_0009.jpg