Building "B" Renovation

 

 

  •  01/01/2010 Final Pictures Of Building B

 20100115bldgbfinal01.jpg

 

20100115bldgbfinal02.jpg

 

20100115bldgbfinal03.jpg

 

20100115bldgbfinal04.jpg

 

20100115bldgbfinal05.jpg

20100115bldgbfinal06.jpg

 

 

20100115bldgbfinal07.jpg

 

20100115bldgbfinal08.jpg

 

20100115bldgbfinal09.jpg

 

20100115bldgbfinal10.jpg

 

20100115bldgbfinal11.jpg

 20100115bldgbfinal12.jpg

 

20100115bldgbfinal13.jpg

 

20100115bldgbfinal14.jpg

 

20100115bldgbfinal15.jpg

 20100115bldgbfinal16.jpg

  • 09/22/2009 Project Update: 

      Construction of two new decks for units B-201 & B-301 complete. Ceiling panel installation and trim work in progress.

20090922 IndSprBldB23.jpg

20090922 IndSprBldB24.jpg 

 

 

  • 08/11/2009 Project Update:

     Rear side of building B. Balcony/porch floor structure of Unit B-301 was demolished, due to wood rot to the deck structure and joist overload with concrete slab.

20090811IndSprBldB21.jpg 

     Rear side of building B. Porch floor structure of unit B-201 was demoliched, due to minor wood rot to the deck structure and joist overload with concrete slab. New porch structure being built with pressure treated wood.

20090811IndSprBldB22.jpg

  • 07/13/2009 Project Update:

     Demolition and repair work complete on the rear side of Units B-101, B-201 and B-301 exept wood rot repair in balcony and porch floor of Unit B-301.  Master bedroom windows are being installed on the rear side.

20090612IndSprBldB18.jpg 

      Demolition and repair work complete on the left side of building B. Kitchen windows installation in progress for units B-101, B-201 and B-301.

20090612IndSprBldB19.jpg

      Demolition and repair work complete on the front side of Units B-101, B-201 and B-301. front side bedroom windows being installed for units B-101, B-201 and B-301. Soffit and fascia trim installation almost complete, exept small area above front bedroom of Unit B-301, where wood rot repair required to subfascia and wall framing.

20090612IndSprBldB20.jpg 

 

 

  • 06/12/2009 Update:

     Demolition and repair work complete on front side of Units B-103, B-203, B-303. Windows replacesd, siding and trim installation complete. Roof shingle replacement complete. Paint work in progress.

20090612IndSprBldB09.jpg 

      Demolition and repair work complete on right side exterior wall of Units B-103, B-203, B-303. Windows replacesd, siding and trim installation complete. Roof shingle replacement complete. Paint work in progress.

20090612IndSprBldB11.jpg

     Demolition and repair work complete on the rear side of units B-103, B-203 & B-303.  Siding and trim installation almost complete on the rear side of units B-102, B-202 & B-302.

20090612IndSprBldB12.jpg 

       Demolition work begining on the rear side of units B-101, B-201 & B-301.  Additional set of guard rails will be required for unit B-201 balcony. Siding installation in progress on chimney above unit B-202.

20090612indsprbldb13.jpg

     Siding and trim installation complete in exterior walkways on all three floors.

20090612IndSprBldB14.jpg

      Window replacement and siding/trim installation complete on the front side of unit B-102, B-202 & B-302.

20090612IndSprBldB16.jpg 

     Aluminum bullnose installed on all stair risers. Waterproofing applied on all stairwells and landings.

20090612IndSprBldB17.jpg 


  • 02/26/2009 Update:

     Project work on Building B started on February 18, 2009.  Demolition and repair work in progress on first, second and third floor walkways, front side of units B-103, B-203 and B-303.

20090226IndSprBldB01.jpg 

     Siding and trim removed on right side walls of units B-103, B-203 and B-303. Exterior sheathing removed. Ready for termite inspection.

20090226IndSprBldB03.jpg 

     Rear side elevation view of Units B-103, B-203 and B-303.

 20090226IndSprBldB04.jpg

     Rear side elevation view of Units B-102, B-202, B-302, B-101, B-201 and B-301.

 20090226IndSprBldB05.jpg

     Left side elevation view of units B-101, B-201 and B-301.

20090226IndSprBldB06.jpg

     Front side elevation view of units B-101, B-201 and B-301.

20090226IndSprBldB07.jpg 

Front side middle section view of Building B.

20090226IndSprBldB08.jpg